PRO TECHNICIAN

Outline of Overhaul

Outline

The following pages are designed to enable you to master the inspection and repair procedures of electrical equipment, including the functions of the starting system by performing the following work.
 
1. Removal
Remove the starter.
 
2. Disassembly
Disassemble the starter.
 
3. Inspection
Check starter-related parts such as armature, commutator, etc.
 
4. Reassembly
Reassemble the starter.
 
5. Test
Conduct a unit test of the starter.
 
6. Installation
Install the starter.

(28)